Benefit-Cost Screening and Non-Energy Benefits for Active Demand Reduction
Eversource Electric
Project Complete
On behalf of Eversource Electric in Connecticut, Synapse developed an active demand reduction (ADR) benefit-cost (BC) screening model. Additionally, Synapse investigated storage benefits beyond those captured in the 2018 Avoided Energy Supply Costs study to be used either as quantitative inputs to the BC screening model or as qualitative information that will support the development of storage programs. By drawing upon literature reviews and common industry assumptions, Synapse produced storage non-energy benefits that could be input into the ADR BC model.